Monthly Archives : July 2016

Victor Hot Cupboard Bain Marie Installation

With their existing built-in Hot Cupboard Bain Marie beyond repair, a school in Radstock were desperate to get a replacement supplied and fitted as soon as possible. This was not a straight forward job as the existing unit was part of a built-in suite.

The IDS team used their experience and skills to remove the existing unit, install the new purpose built hot cupboard and rebuild the whole section as one.

Another satisfied customer.

Join us on Social Media
Gas Safe LogoSafe Contractor Approved LogoSafe Contractor Approved Logo
Sign-up to our mailing list